Power Plants

The member-companies of HAIPP own and operate modern natural gas-fired power plants. These plants have high availability 24/7 and all year round, high flexibility and low carbon dioxide emissions compared to their oil, lignite and coal counterparts.

ENERWAVE

ENERWAVE

Natural Gas-fired Combined Cycle Power Plant

Location
Thessaloniki
Construction
2004

Installed power
430 MW
Operation
12/2005
ENERWAVE

ENERWAVE

Natural Gas-fired Combined Cycle Power Plant

Location
Thisvi, Viotia
Construction
2009

Installed power
421,6 MW
Operation
12/2010

HERON

HERON

Natural Gas-fired Combined Cycle Thermoelectric Power plant

Location
Thiva
Construction
2010

Installed power
442 MW
Operation
11/2010

Korinthos Power

Korinthos Power

JV 35% of Motor Oil & 65% of METLEN Energy & Metals

Gas-fired Combined Cycle Thermal Power Plant (CCGT)

Location
Agioi Theodoroi, Korinthia
Construction
2009-2012

Installed power
436.6 MW
Operation
04/2012

METLEN Energy & Metals

METLEN Energy & Metals

CCGT Combined Cycle Unit, 826 MW

Location
Agios Nikolaos, Viotia
Construction
2019-2012

Installed power
826 MW
Operation
2022
METLEN Energy & Metals

METLEN Energy & Metals

Gas-fired Combined Cycle Thermal Power Plant, 444,48 MW

Location
Agios Nikolaos, Viotia
Construction
2009-2011

Installed power
444,48 MW
Operation
2011
METLEN Energy & Metals

METLEN Energy & Metals

High Efficiency Electricity and Heat Cogeneration Station (SITHYA)

Location
Agios Nikolaos, Viotia
Construction
2005-2008

Installed power
334 MW
Operation
2008

Thermoilektriki Komotinis

Thermoilektriki Komotinis

50/50 JV of GEK TERNA & Motor Oil

Combined Cycle Gas Turbine (CCGT) Power Plant fueled with Natural Gas

Location
Komotini
Construction
2024

Installed power
877 MW
Operation
11/2024