KORINTHOS POWER S.A.

Gas-fired Combined Cycle Thermal Power Plant (CCGT) photo7.jpg Location: Agioi Theodoroi, Korinthia Planning, construction: METKA Installed capacity: 436,6 MW Operation: April 2012